location_on Sevier fee schedule confirmed · Knox, Blount, Hamilton pending
EAST TENNESSEE SEPTIC FIELD GUIDE
Independent cost data & soil-specific estimates
PERMIT GUIDE COUNTY FEE SCHEDULES // 1 OF 4 CONFIRMED
SEVIER CONFIRMED · KNOX, BLOUNT, HAMILTON PENDING
PERMIT GUIDE COUNTY ENVIRONMENTAL HEALTH OFFICES & TDEC

EAST TENNESSEE COUNTY PERMITTING & REGULATORY GUIDE

What each county charges, what you file, and what happens when an inspection fails — for Sevier, Knox, Blount and Hamilton counties. Where we have not confirmed a fee, the page says so.

gavel
APPROVAL HAS TO COME FIRST // STATEWIDE

A construction permit must be issued before work starts. Claims filed after the job is finished get rejected, and the fix is expensive — sometimes excavating a completed installation. If a contractor offers to start while the paperwork catches up, get another quote.

PERMIT BEFORE WORK
ILLUSTRATION NOT A PHOTO
Illustration of a county environmental health permit desk with septic permit paperwork
Illustration: a county environmental health permit desk FIG. 04-A
The permit you pull is not the licence your contractor holds

You pull a construction permit through the county for the work on your property. Separately, the person doing the work must hold an installer permit issued by TDEC: $200 for conventional systems, plus $100 for each alternative type they are approved to install — low pressure pipe, mound, oxidation lagoon, aerobic treatment. If your site needs a mound and the contractor only holds the conventional permit, they cannot legally do the job.

HOW A PERMIT GOES THROUGH FIVE STEPS
01
Application & fee Filed with the county environmental health office. Sevier: $300 new system, $75 repair, by mail, no cards. Other counties: statewide range $150–500 until confirmed.
02
Soil evaluation A perc test ($300–800) or a soil scientist’s map decides which system types the site is allowed. Do this before any contractor quotes.
03
Construction permit issued Before anything is dug. The permit names the system type and the tank size, which Tennessee sets by bedroom count.
04
Inspection before backfill The sanitarian sees the open installation. If it fails in Sevier: written or verbal notice, a $100 Re-Inspection Application, then a call between 8:00 and 9:00am to reschedule.
05
Approval & inspection letter Final approval on file with the county. If you later sell, the buyer’s lender will ask for an inspection letter — Sevier charges $100 for it.
Permit first, then dig No retroactive approval
SECTION 02 // COUNTY BY COUNTY

FEE SCHEDULES BY COUNTY

1 OF 4 CONFIRMED
FEES CONFIRMED
Enforcing Agency: Sevier County Environmental Health Sevierville, Pigeon Forge, Gatlinburg, Seymour and the county PAYMENT BY MAIL | CARDS NOT ACCEPTED
Standard Fee Sched (Res. Single Family):
NEW SYSTEM $300
REPAIR $75
INSPECTION LTR $100
What to know before you file:
  • Repair vs new: a repair permit is $75, a new-system permit $300. Ask which one the installer filed and why.
  • Failed inspection: written or verbal notice, a Re-Inspection Application with a $100 fee, then a call between 8:00 and 9:00am to be rescheduled.
  • Also billed: water sample $100; subdivision evaluation $75 per lot plus $75 per existing home.
Fee schedule status: Confirmed against the county schedule
FEES NOT CONFIRMED
Enforcing Agency: Knox County Environmental Health Knoxville, Farragut, Powell, Corryton and the county CALL THE COUNTY OFFICE FOR THE CURRENT SCHEDULE
Standard Fee Sched (Res. Single Family):
NEW SYSTEM $150–500
REPAIR TBC
INSPECTION LTR TBC
What to know before you file:
  • Statewide range shown: $150–500 for a construction permit; Knox County’s own schedule is not yet confirmed on this site.
  • Ask for four figures: new-system permit, repair permit, inspection letter, re-inspection fee and how rescheduling works.
  • Karst ground: shallow bedrock on some lots pushes the design to a mound or treatment unit and roughly doubles the field cost.
Fee schedule status: Not yet confirmed
FEES NOT CONFIRMED
Enforcing Agency: Blount County Environmental Health Maryville, Alcoa, Townsend, Louisville and the county CALL THE COUNTY OFFICE FOR THE CURRENT SCHEDULE
Standard Fee Sched (Res. Single Family):
NEW SYSTEM $150–500
REPAIR TBC
INSPECTION LTR TBC
What to know before you file:
  • Statewide range shown: $150–500 for a construction permit; Blount County’s own schedule is not yet confirmed on this site.
  • Ask whether they take cards: several East Tennessee offices still require payment by mail, which adds days to a closing timeline.
  • Foothill ground: valley floor to Smokies foothills; which system your lot is allowed depends on the soil test.
Fee schedule status: Not yet confirmed
FEES NOT CONFIRMED
Enforcing Agency: Hamilton County Environmental Health Chattanooga, Soddy-Daisy, Signal Mountain, Ooltewah and the county CALL THE COUNTY OFFICE FOR THE CURRENT SCHEDULE
Standard Fee Sched (Res. Single Family):
NEW SYSTEM $150–500
REPAIR TBC
INSPECTION LTR TBC
What to know before you file:
  • Statewide range shown: $150–500 for a construction permit; Hamilton County’s own schedule is not yet confirmed on this site.
  • Chattanooga pricing: complete replacement $15,000–30,000, tank only $3,000–8,000.
  • Ridge lots: shallow bedrock requires more expensive designs than valley lots; get the perc test first.
Fee schedule status: Not yet confirmed
CIVIL RESEARCH PROTOCOL

HOW TO AUDIT AN EXISTING HISTORICAL PERMIT ON FILE

verified_user WHERE THE OLD PERMIT LIVES
METHOD 01 // INSTANT GIS search

TDEC Water Resources Data Viewer

TDEC runs an online data viewer that holds subsurface sewage disposal records for many properties. Searches work best with the parcel ID, or the subdivision name and lot number.

PREREQUISITE DATA: • County and parcel ID
• Owner or builder name at the time
• Subdivision name and lot number
METHOD 02 // ASK THE COUNTY history_edu

County office records request

Older installations are often on paper at the county environmental health office rather than online. Ask for the septic file for your parcel; a public records request works if the desk cannot find it.

WHAT TO BRING: • Parcel ID and the previous owner’s name
• Ask about response time and copy fees
• Ask whether they accept cards or mail only
METHOD 03 // NO PERMIT FOUND warning

If there is no permit on file

A missing permit usually stops the financing rather than the sale. Lenders generally require an inspection letter showing the system works, and the county charges for that letter separately from any permit.

WHAT IT COSTS: • Pump-out and inspection of the tank: $300–600
• Inspection letter: $100 in Sevier, ask elsewhere
• Repairs, if found, need their own permit
SECTION 04 // WHAT YOU FILE ASK YOUR COUNTY FOR ITS FORMS
FIRST Soil evaluation

A perc test ($300–800) or a soil scientist’s map. It decides which system types the site is allowed, so it comes before any quote.

REQUIRED task_alt
SECOND Site plan

Where the house, driveway, well and property lines are, and where the field and its reserve area go. The county tells you the scale and format it wants.

REQUIRED task_alt
THIRD Water source

Whether the house is on public water or a private well. Wells need a setback from the field; the county sets the distance.

REQUIRED task_alt
FOURTH Installer’s TDEC permit

The installer’s TDEC installer permit: $200 for conventional systems, plus $100 for each alternative type. Match it to the system your soil requires.

REQUIRED task_alt
folder_zip There is no single statewide packet — each county issues its own application. Run your numbers first, then call the office.
Estimate your job
SECTION 05 // FIELD UTILITY CONFIRMED FEE LOOKUP

SEVIER COUNTY FEE SCHEDULE — CONFIRMED

The one county schedule we have confirmed against the county’s own published figures. Select a line item to see what Sevier County Environmental Health charges for it:

SEVIER COUNTY ENVIRONMENTAL HEALTH
$300 PER FILING

Septic permit for a new system. Filed by mail with payment attached; the county does not accept cards. Contractors sometimes file this instead of the $75 repair permit because it is simpler for them — ask which one went in.

verified Payment by mail · cards not accepted